Fast and Reliable Natural Gas Deliveries

At East Central Gas Co-Op Ltd, we are committed to providing reliable natural gas deliveries in the Rural Hanna area. Our professional distribution services ensure that your natural gas needs are taken care of efficiently and effectively.

Hero image showing dashboard

Providing Reliable
Natural Gas
Deliveries in the Rural Hanna Area

At East Central Gas Co-Op Ltd, we offer professional distribution services to meet all your natural gas needs. Contact us today to learn more.

features image showing calls and notifications

Where It All Began…

On April 26, 1972, Elmer Mohl, Nelson Annas, Jim Peacock, Albert Storch, Rudy Annas, Harry Gordon, John Kaempf, Norman Van Dam, Leon Gall, Edward Storch, S.J. Slorstad, Elmer Pfahl, George Kingcott, Gordon O. Johnston, Herb Wimmer and William Paxman held a meeting and elected to form a Gas Co-op to be named the East Central Natural Gas Co-op Ltd. 

Elected as directors of the Provisional Board were Albert Storch (President), Leon Gall ( Vice-President), Lloyd Hutton (Secretary), Jim Peacock, Harry Gordon, Lou Lohrman, S.J. Slorstad, John Kaempf, and Norman Van Dam. 

Due to the efforts of these men, the East Central Gas Co-op Ltd. was incorporated and a Memorandum of Association was registered with the Government on July 5, 1972.  Meetings were held with the Government, Engineers and Consultants to discuss financing, feasibility, franchise and canvassing. Omega Techno Engineering Consultants were hired to do preliminary studies and to supply the engineering services to aide this project into becoming an actuality. 

In 1973, armed with contract forms, easement forms, lien note forms, deposit forms, and refusal forms, the Directors proceeded to signup members.  September 28, 1973 was to be Launch Day. 

Bothwell Bros. were hired to lay the pipeline in the area North of Highway #9 and Henusett Construction was hired to lay the pipeline in the area South of Highway #9. 

As can be expected on a project of this size and magnitude, problems began to develop and Mr. Eugene Kush became involved providing the legal advice needed. Engineering costs and time became questionable, contractors were plowing in shallow pipe and extra billing, and the quality of the pipe was questionable. 

In 1975, the Co-op terminated Omega Techno services and became involved in a lawsuit with both Omega Techno and Henusett Construction, which lasted several years. 

The Co-op had to re-plow the pipe in the South area, where the shallow pipe was found which along with the lawsuit added tremendous cost financially and in public relations to the Co-op.  At the same time, 3,306 pipe resin were found to be inferior and areas where this pipe was in the ground had to be re-plowed.  On top of all of this, the world was also beginning to feel the effects of the first energy crisis resulting in an increase in the gas price. 

CU Engineering and Skocdopole Construction were hired to do the re-plowing and finish the construction of the remaining pipeline.  By the end of 1977, the pipeline had been Installed to all those members who had signed up for the natural gas service and the Co-op was using Gas Alberta’s billing system to bill the 454 customers who were on the stream.

Reliable Natural Gas Deliveries

Contact us for fast and professional natural gas distribution services in the Hanna area.

Call to action image

Currently has 2014 Kilometers of poly line, 206 Kilometers of aluminum high pressure line and½ Kilometer of steel pipe.

984
128
2
6

Currently we have 2,014 Kilometers of poly line,
206 Kilometers of aluminum high pressure line
and ½ Kilometer of steel pipe.

984

Customers

128

Townships

2

Villages

6

Hamlets

Contact us

Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Phone
403-854-4411
Office
406 5 St E, Hanna, AB T0J 1P0
Hours of Operation:
8am-4:30pm Monday to Friday